Building Fees

Flat-rate minimum permit fee is $199.


Important

The building permit will not be processed until a complete application is submitted.

Please allow enough time for the building division to process your building permit application. The time will depend on the workload of the division but must meet the maximum timeframe allowed in the Ontario Building Code.

Where applicable, approval from Welland Fire and Emergency Services, Niagara Regional Health Unit or Traffic Services, Ministry of Labour, Niagara Peninsula Conservation Authority, Ministry of Environment, Fire Marshal’s Office, Ministry of Transportation, or any other regulatory agency will be required before the issuance of a building permit. You can consult with staff to coordinate.

A: Construction — new buildings, additions, alterations
Description Charging Parameter Fee
Minimum permit fee Flat $199
Group A: assembly occupancies
New and additions $/ft² $2.50
Alterations/renovations $/ft² $0.76
Group B: detention, care and treatment, and care occupancies
New and additions $/ft² $2.68
Alterations/renovations $/ft² $0.76
Group C: residential occupancies
New and additions — detached, semi-detached, townhouse, and rowhouse $/ft² $1.74
New and additions — multi-unit, apartments, hotels, and other $/ft² $1.59
Alterations/renovations $/ft² $0.76
Accessory dwelling unit $/ft² $0.55
Garage, deck, shed, and sunroom Flat $199
Groups D/E: business, personal services, and mercantile occupancies
New and additions — finished $/ft² $2.35
New and additions — shell $/ft² $1.69
Alterations/renovations $/ft² $0.76
Group F: industrial occupancies
New and additions — finished $/ft² $2.01
New and additions — shell $/ft² $0.65
Alterations/renovations $/ft² $0.76
Miscellaneous: other
Designated structures — retaining walls $/linear ft $12.57
Designated structures — all other Flat $1,108
Farm building, accessory building, greenhouse $/ft² $0.71
Public pool Flat $593
Roof $/ft² $0.23
Shoring and/or building excavation $/linear ft $12.57
Underpinning existing foundation $/linear ft $12.57
B: Stand alone and miscellaneous work
Description Charging Parameter Fee
Tents/temporary Flat $308
Demolition — one-family dwelling/building less than 3,000 ft² GFA Flat $308
Demolition — other $/ft² $0.23
C: Life safety systems
Description Charging Parameter Fee
Electromagnetic locking device Per item $404
Commercial kitchen exhaust hood, dust collectors, fire alarm, spray booth, sprinkler system, or standpipe and hose system Flat (including four devices) plus $/device greater than four $1,613 plus $432 (greater than four)
D: Mechanical
Description Charging Parameter Fee
New/alterations to HVAC standalone — house Flat $308
New/alterations to HVAC standalone — other $/ft² $0.19
E: Plumbing
Description Charging Parameter Fee
Site servicing/private water lines $/linear ft $2.94
Plumbing fixtures, including backflow prevention devices and backwater valves $/fixture $18.87
F: On-site sewage system
Description Charging Parameter Fee
Construction of a septic system — Class 4 Flat $1,152
Construction of a septic system — other Flat 1,038
G: Other fees
Description Charging Parameter Fee
Certified model home service Flat $481
Fast track service (in addition to the regular permit fee payable for the entire project) Flat plus $/hr over four hours $592 plus $150 per hour
Alternative solution application Flat plus $/hr over four hours $578 plus $143 per hour
Change of use permit Flat $308
Transfer of permit Flat $308
Occupancy permit (of unfinished building) Flat $313
Partial permits/staged construction — foundation stage including underground site services Flat plus applicable fee per cent $411 plus 25 per cent of applicable fee
Partial permits/staged construction – superstructure Flat plus applicable fee per cent $411 plus 25 per cent of applicable fee
Partial permits/staged construction - interior finishing Flat plus applicable fee per cent $411 plus 25 per cent of applicable fee
Partial permits/staged construction – completion Flat plus applicable fee per cent $411 plus 25 per cent of applicable fee
Conditional permit Flat $1,393
Amendment to conditional permit agreement Flat $418
H: Signs
Description Charging Parameter Fee
Ground signs exceeding 7.5 metres tall $/ft² $1.26
Projecting sign weighing more than 115 kilograms $/ft² $1.26
Projecting sign attached to a parapet $/ft² $1.26

Source: City of Welland By-law 2020-140

By-law under the Building Code Act with respect to construction, demolition, change of use, occupancy, transfer of permits, and inspections.

Passed by Welland City Council on December 9, 2021.

Building Division
Civic Square,
60 East Main St., Welland, ON L3B 3X4
905-735-1700 x2251 or x2257

Email: devserv@welland.ca

Join Our Mailing List

Discover the benefits our city has to offer.